MUNICIPALITÉ DU CANTON DE MELBOURNE

Municipal inspector – urbanism

Good news for all the citizens of the Township of Melbourne. As promised, an agreement has been reached with an interim external inspector firm to study your requests and issue permits. Request and questions must be sent by email. Address is writing below.

PERMIT REQUEST

Permit request forms must be returned to the municipal office along with the payment, to be studied by the municipal inspector who will then emit the permit or certificat, as necessary.
Permit request form
Tree cutting permit (no procedure to come)


ZONING BY LAWS AND MAPS

Here is the list of zoning by-laws and urban plan:

(documents not available in English)

Construction By-law
2008-01 Urban planning2008-04 Subdivision By-law
2008-02 Zoning by-law
*** 2008-02 Annex – layout grid
*** 2008-02 Annex – grid of use
*** 2008-02 – Sites prohibited for construction of pre signboard
2008-04 Subdivision By-law
2008-05 Permits and Certificate by-law
2008-06 Conditions for emission of a permit
Pool safety and installation
2011-09 Urban planning map
Zoning plan PU 2018
Zoning plan 2018


SEPTIC INSTALLATIONS

Tax credit for the upgrading of residential wastewater treatment plants.

Clic HERE  to access informations for the tax credit (French only)


WORK ON THE EDGE OF A WATERCOURSE

Do you own a waterfront property?
You must apply for a permit and comply with the regulations of your municipality before doing any work on the edge of a watercourse.
To guide you, the Val-Saint-François MRC has created 6 information documents:

(documents not available in English)
FICHE 1: L’identification des cours d’eau
FICHE 2: Les barrages
FICHE 3: Rives
FICHE 4: Traverses: pont, ponceau
FICHE 5: Fossés et sorties de drain
FICHE 6: Projets d’agrandissement ou de développement


HOGWEED

How to recognize

Comments are closed.